Azure commissions final phase of 50 MW solar power plant in Uttar Pradesh
Posted on
Azure Power has commissioned the final phase of its 50 MW solar power plant in Uttar Pradesh. Azure Power will provide power for 25 years at a tariff of 7 cents per kWh to the National Thermal Power Corporation. o | CVy) |
Source:
Economic Times