The Delhi Electricity Regulatory Commission (DERC) has finalized the group and virtual net metering guidelines. The commission has set the minimum project capacity at 5 kilowatts while the maximum will be 5 megawatts (MW) at a single location.


Source: Mercom Go to
In Detail: DERC (Group Net Metering and Virtual Net Metering for Renewable Energy) Guidelines, 2019 Go to