Himachal's 231 MW hydro plant resumes operations
Posted on
Hydro generator NHPC resumed operations at its 231 MW power plant on April 6, 2017. The plant had been shut down since February 1, 2017 due to leakage from the water conducting system.
Source:
Udaipur Kiran