Madhya Pradesh experiences delay in installation of rooftop solar panels under latest application
Posted on
Two months after the application period began, Madhya Pradesh has not installed a single rooftop solar panel under the state’s new rooftop solar policy. The policy allows consumers to produce and sell power to discoms.
Source:
Times of India