NTPC has re-tendered 250 MW of solar capacity at a park in Karnataka after incomplete infrastructure had reduced the interest of developers. Capacity developed under this tender has local content requirements; NTPC also retendered another 750 MW with no local content requirement.


Source: PV Tech Go to